Rubber Dam - bed base arranged
concrete pouring
floor complete upstream
Floor complete downstream
Expand the bottom floor
Perforated bottom gasket
Punch in place foam tape
Dam bag Expand
Lifting dam bag
Expand dam bag in place
Dam bag installation plate
Mechanical bolts
Installation completion
Apply grease to protect the
Plastic protection
Concrete protective plate bolt
Rubber dam Complete results